지금 롯데월드 어드벤처의 엔터테인먼트 팀에서 자체적으로 손을 대서
조명이 공연 처음과는 많이 달라졌죠?
지난 해에 공연 업데이트를 위해 방문했던 고다드 관계자가 공연 실태를 보고
영상과 함께 유튜브에 작성한 글입니다.
Let's Dream v1.1 and an end to my time in Seoul.
We updated the Sky Control system allowing for new drone choreography.
The Lotte Entertainment team added new LED lights to 5 large floats without creative input from GGE.
In my opinion these new lights and their programing are a complete contrast with the original direction of the show.
Gone, under the direction of the Lotte Entertainment Team
are several effects that GGE implemented into these floats in favor of this horrible lighting.
Bubbles no longer spill from the Deep Dreams float.
Batteries, wires, and zip-ties are visible through-out each effected float to accommodate the new lighting.
The amazing rotating sun on the finale float is now stationary,
and the pre-show was drastically altered, among other small unnecessary changes.
However, with all the negative changes,
the original intent and inherently great design by GGE still finds ways to break through and charm the guests.
전반적으로 많이... 화가 많이 난 듯한 뉘앙스가 보이네요.
여러분은 어떻게 생각하세요?